Internal alterations to the Level 5 Surgical Intake meant opening loadbearing walls while the structure above was held up.
- Contractor
- MW Benney
- CASE role
- Temporary support design
- Year
- 2026
The work included new and altered openings, with lintels and beams replaced. We designed the needle beams and props, working from the permanent-works information supplied by Airey & Coles.


Photographs taken during the works, May 2026.