01803 207007
Fort Bovisand from Plymouth Sound, May 2023

Fort Bovisand

Plymouth, DevonWorking platform for a piling rig

Photograph: Ashley Smith, CC BY-SA 4.0

We are designing the working platform for a piling rig during Phase 2 of the harbour redevelopment at Fort Bovisand.

CASE role
Temporary works design
Status
Ongoing

The package covers the platform for a Comacchio MC800 rig: the rig loading, the construction of the granular platform and the support arrangements for extraction, on a constrained coastal site.

The quay at Fort Bovisand
The quay at Fort Bovisand.Nilfanion, CC BY-SA 4.0
The fort's coastal setting
The fort's coastal setting.Nilfanion, CC BY-SA 4.0

The photographs show the fort and harbour before Phase 2.

Send us drawings, photographs or a short description of the job

admin@caseconsultants.com

01803 207007

Registered office
Tor Hill House, Union Street
Torquay, Devon TQ2 5QW